Work of the contract is for construction of the Church Street Storm Sewer System between 33rdStreet and 37thStreet including approximately725 linear feet of 6’ x 2’storm sewer, 730 linear feet of 4’ x 2’ storm sewer, and inlets. Also included is resurfacing of the roadway. A bid alternate includes a sluice gate at the 37th Street outfall at the Ship Channel and cleaning of the line between the Ship Channel and Church Street.
Chuch Street Timeline